Project design completed during employment of previous engineering firm.

The Gateway at Temple City, CA

The project involves the development of four commercial buildings, featuring a 20,000 square foot supermarket that includes retail space and a food court area. Additionally, there are 17,000 square feet allocated for restaurant spaces, 8,500 square feet for retail spaces, and 14,500 square feet designated for office spaces.

Napa Junction Round Table Renovation & New Tenant

The project scope involves reconfiguring an existing single-tenant Roundtable Pizza restaurant into two separate tenant spaces. One of these spaces will continue to house the Roundtable Pizza restaurant, while the other will be designed for a new tenant, covering an area of 750 square feet. The MEP design includes the replacement of the HVAC system, the development of a new power and lighting layout, and the installation of new plumbing systems.

 Wing Hop Fung in El Monte

The project involves tenant improvements for the Wing Hop Fung retail shop, located on the ground floor of an existing plaza on Garvey Ave in El Monte. The retail space encompasses 2,500 square feet.

Previous
Previous

Signature Nails Spa (West Covina)

Next
Next

Residential